Engine Top End
Air Switching Valve Installation
In this manual: Engine Top End
~1min read
- Install the air switching valve [A] with hose [B] as shown in the figure.

Air Switching Valve Operation Test
- Refer to the Air Suction System Damage Inspection in the Periodic Maintenance chapter.
Air Switching Valve Unit Test
- Refer to the Air Switching Valve Unit Test in the Electrical System chapter.
Clean Air System Hose Inspection
- Be certain that all the hoses are routed without being flattened or kinked, and are connected correctly to the air cleaner housing, air switching valve and air suction valve covers.
If they are not, correct them. Replace them if they are damaged.
Test yourself
A quick Kawasaki Ninja ZX-10R quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?