Engine Top End

Premuffler Chamber Installation

~1min read
  • Replace the premuffler chamber gasket [A] with a new one.
  • Install the premuffler chamber gasket to the premuffler chamber [B] until it is bottomed so that the chamfer side faces exhaust pipe [C].
  • Install the exhaust pipe clamp [D] as shown in the figure.
  • Insert the projection [E] into the slot [F].
  • Install the premuffler chamber.
  • Tighten the mounting bolt [G] and clamp bolt [H] securely.

Torque - Premuffler Chamber Mounting Bolt: 34 NВ·m (3.5 kgfВ·m, 25 ftВ·lb)

Premuffler Chamber Installation

  • Install the removed parts (see appropriate chapters).
  • Thoroughly warm up the engine, wait until the engine cools down, retighten all the bolts.

Test yourself

A quick Kawasaki Ninja ZX-10R quiz: every answer comes with an explanation and a link to the manual page.