Driveline transfer: TY21B
Removal and Installation
In this manual: Driveline transfer: TY21B
~1min read
REMOVAL
1. Separate the rear propeller shaft. Refer to DLN-121, "Removal and Installation". 2. Remove right side drive shaft. Refer to FAX-24, "RIGHT SIDE : Removal and Installation". 3. Remove catalyst convertor support bracket (RH). EM-35, "4WD : Removal and Installation".4. Remove heat insulator (1).

5. Remove transfer gusset (1). 6. Remove catalyst convertor upport bracket rear. EM-59, "4WD : Removal and Installation". 7. Remove rear torque rod and rear torque rod bracket. Refer to EM-59, "4WD : Removal and Installation".
8. Remove the mounting bolts of transaxle assembly and transfer assembly.

9. Remove transfer assembly from the vehicle.
: Vehicle front
CAUTION:
Never damage ring gear shaft.

INSTALLATION
Note the following, and install in the reverse order of removal.
• When installing the transfer to the transaxle, install the mounting bolts following the standard below.


CAUTION:
• When installing transfer assembly to transaxle assembly, replace the side oil seal (transfer joint). Refer to TM-292, "Removal and Installation".
• Never damage side oil seal (the joint part of transfer).
• When installing heat insulator (1), install the mounting bolts and nut following procedure.


• Check oil level and check for oil leakage after installation. Refer to DLN-90, "Inspection".
Was this page helpful?