Engine
Schematic and routing diagram
In this manual: Engine
20steps
~120min
4/5difficulty
Done 0 of 20
Cooling circuit diagram

Water hose routing diagram

Water hose routing diagram

- Thermostat air bleeder hole
- Cushion
- O-ring
- Radiator heat guard : be careful not to damage the pawls when removing.
Yellow
marking
White
marking
Clamp end
should face downward
Clamp end
should face right side
Cut off the
excess tip of the clamp
Screw head
should face right side.
Screw head
should face backward.
Clamp end
should face upward
Clamp end
should face left side.
Screw head
should face forward.
Screw head
should face left side.- 2 – 8 Mm (0.08 – 0.31 In)
- Clearance
6
N·m (0.6 Kgf-m, 4.5 Lbf-ft)
10 N·m
(1.0 Kgf-m, 0.7 Lbf-ft)
13 N·m
(1.3 Kgf-m, 9.5 Lbf-ft)
Apply engine oil.
Test yourself
A quick Suzuki GSX-R 1000 quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?