Installation
INSTALLATION
Procedure | Part Name Code | ![]() | ![]() | ![]() |
|
|---|---|---|---|---|---|
1 |
NO. 2 EXHAUST MANIFOLD HEAT INSULATOR |
17168 |
- |
- |
- |
2 |
EXHAUST MANIFOLD (TWC: Front Catalyst) |
17141 |
- |
- |
|
3 |
MANIFOLD STAY |
17118 |
- |
- |
- |
4 |
NO. 1 EXHAUST MANIFOLD HEAT INSULATOR |
17167 |
- |
- |
- |
5 |
AIR FUEL RATIO SENSOR |
89467B |
- |
- |
- |
6 |
FRONT NO. 1 FLOOR HEAT INSULATOR |
58151 |
- |
- |
- |
![]() |
N*m (kgf*cm, ft.*lbf): Specified torque |
● |
Non-reusable part |
* |
For use with SST |
- |
- |
Procedure | Part Name Code | ![]() | ![]() | ![]() |
|
|---|---|---|---|---|---|
7 |
FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst) |
17410 |
- |
- |
|
8 |
FRONT FLOOR CENTER BRACE |
57533B |
- |
- |
- |
9 |
INSPECT FOR EXHAUST GAS LEAK |
- |
- |
- |
|
10 |
NO. 1 ENGINE UNDER COVER ASSEMBLY |
51410 |
- |
- |
- |
![]() |
N*m (kgf*cm, ft.*lbf): Specified torque |
● |
Non-reusable part |
PROCEDURE
1. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
2. INSTALL EXHAUST MANIFOLD (TWC: Front Catalyst)
(1) Install a new exhaust manifold to head gasket to the cylinder head sub-assembly.
(2) Using a 12 mm deep socket wrench, temporarily install the exhaust manifold (TWC: Front Catalyst) to the cylinder head sub-assembly with 7 new nuts.
(3) Using the 12 mm deep socket wrench, tighten the 7 nuts in the order shown in the illustration.
Torque:
26 N·m {265 kgf·cm, 19 ft·lbf}
3. INSTALL MANIFOLD STAY
(1) Temporarily install the manifold stay to the exhaust manifold (TWC: Front Catalyst) and cylinder block sub-assembly with the bolt and nut.
(2) Tighten the bolt and nut in the order shown in the illustration.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
4. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
5. INSTALL AIR FUEL RATIO SENSOR
Click here ![]()
6. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
Click here ![]()
7. INSTALL FRONT EXHAUST PIPE ASSEMBLY (TWC: Rear Catalyst)
*1 |
Exhaust Manifold (TWC: Front Catalyst) or Front Exhaust Pipe Assembly (TWC: Rear Catalyst) |
*2 |
Gasket |
*a |
Wooden Block |
*b |
Plastic Hammer |
(1) Using a vernier caliper, measure the free length of the compression springs.
Standard Length (Front) |
43 mm (1.69 in.) |
Standard Length (Rear) |
40 mm (1.57 in.) |
Minimum Free Length (Front) |
41.5 mm (1.63 in.) |
Minimum Free Length (Rear) |
38.5 mm (1.52 in.) |
If the free length is less than the minimum, replace the compression spring.
(2) temporarily install 2 new gaskets to the exhaust manifold (TWC: Front Catalyst) and front exhaust pipe assembly (TWC: Rear Catalyst).
(3) Using a plastic hammer and wooden block, tap in each gasket until its surface is flush with the exhaust manifold (TWC: Front Catalyst) and front exhaust pipe assembly (TWC: Rear Catalyst).
NOTICE:
- Be sure to install the gasket in the correct direction.
- Do not reuse the gaskets.
- Do not damage the gaskets.
- Do not push in the gaskets by using the exhaust pipes when connecting them.
*1 |
Exhaust Manifold (TWC: Front Catalyst) |
*2 |
Front Exhaust Pipe Assembly (TWC: Rear Catalyst) |
*3 |
Tail Exhaust Pipe Assembly |
*4 |
Gasket |
*a |
Space between Flanges: 8.5 mm (0.335in.) |
*b |
Space between Flanges: 6.5 mm (0.256in.) |
(1) Connect the front exhaust pipe assembly to the 3 exhaust pipe supports.
(2) Install the front exhaust pipe assembly (TWC: Rear Catalyst) to the exhaust manifold (TWC: Front Catalyst) with the 2 compression springs and 2 bolts.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
(3) After installation, check that the space between the flanges of the exhaust manifold (TWC: Front Catalyst) and front exhaust pipe assembly (TWC: Rear Catalyst) is consistent front-to-rear and left-to-right.
(4) Install the front exhaust pipe assembly (TWC: Rear Catalyst) to the tail exhaust pipe assembly with the 2 compression springs and 2 bolts.
Torque:
43 N·m {438 kgf·cm, 32 ft·lbf}
(5) After installation, check that the space between the flanges of the front exhaust pipe assembly (TWC: Rear Catalyst) and tail exhaust pipe assembly is consistent front-to-rear and left-to-right.
(6) Engage the wire harness clamp.
(7) Connect the heated oxygen sensor connector.
8. INSTALL FRONT FLOOR CENTER BRACE
Torque:
15 N·m {153 kgf·cm, 11 ft·lbf}
9. INSPECT FOR EXHAUST GAS LEAK
![]() |
Click here |
10. INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
Click here ![]()
.png)
.png)
.png)
.gif)
.png)