Power Source & Network
Installation
In this manual: Power Source & Network
~1min read
INSTALLATION
COMPONENTS (INSTALLATION)
Procedure | Part Name Code | ![]() | ![]() | ![]() |
|
|---|---|---|---|---|---|
1 |
BATTERY STATE SENSOR ASSEMBLY |
28850C |
- |
- |
- |
2 |
SIDE DECK TRIM SERVICE HOLE COVER |
64735 |
- |
- |
- |
3 |
INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL |
- |
- |
- |
|
![]() |
Tightening torque for "Major areas involving basic vehicle performance such as moving/turning/stopping" : N*m (kgf*cm, ft.*lbf) |
- |
- |
PROCEDURE
1. INSTALL BATTERY STATE SENSOR ASSEMBLY
Torque:
Nut (A) :
5,4 N·m {55 kgf·cm, 48 in·lbf}
Nut(B) :
7,6 N·m {77 kgf·cm, 67 in·lbf}
2. INSTALL SIDE DECK TRIM SERVICE HOLE COVER
3. INITIALIZATION AFTER RECONNECTING AUXILIARY BATTERY TERMINAL
HINT:
When disconnecting and reconnecting the auxiliary battery, there is an automatic learning function thatcompletes learning when the respective system is used.
Click here ![]()
Was this page helpful?
.png)
.png)
.png)
.gif)
.png)