Other system
Installation
In this manual: Other system
~1min read
1. INSTALL POWER POINT SOCKET ASSEMBLY

- Engage the 2 claws to install the power point socket assembly.
2. INSTALL INSTRUMENT CLUSTER CENTER LOWER FINISH PANEL SUB-ASSEMBLY
3. INSTALL POSITION INDICATOR HOUSING ASSEMBLY
4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
5. INSTALL INSTRUMENT CLUSTER CENTER NO. 2 FINISH PANEL
6. INSTALL INSTRUMENT CLUSTER CENTER NO. 1 FINISH PANEL
Test yourself
A quick Toyota Sienna quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?