Can Communication
Network Gateway Ecu
In this manual: Can Communication
~1min read
Components COMPONENTS ILLUSTRATION
Installation INSTALLATION PROCEDURE
Installation INSTALLATION PROCEDURE
1. INSTALL NETWORK GATEWAY ECU
(a) Install the network gateway ECU with the bolt.
Torque:
3 N·m {31 kgf·cm, 27 in·lbf}
(b) Connect the connector.
2. INSTALL LOWER INSTRUMENT PANEL ASSEMBLY
(See page
)
1. REMOVE LOWER INSTRUMENT PANEL ASSEMBLY
(See page
)
2. REMOVE NETWORK GATEWAY ECU
(a) Disconnect the connector. |
![]() |
(b) Remove the bolt and network gateway ECU.
Test yourself
A quick Toyota Tacoma quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?
