Installation
INSTALLATION
HINT:
A bolt without a torque specification is shown in the standard bolt chart.
Click here ![]()
PROCEDURE
1. INSTALL NETWORK GATEWAY ECU
(a) for Floor Shift Type:
(1) Install the network gateway ECU with the 2 nuts.
Torque:
7,5 N·m {76 kgf·cm, 66 in·lbf}
(2) Connect the connector.
(b) for Column Shift Type:
(1) Install the network gateway ECU and shift lock control ECU with the 2 nuts.
Torque:
7,5 N·m {76 kgf·cm, 66 in·lbf}
(2) Connect the 2 connectors.
(3) Attach the clamp.
2. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY RH
(a) for Column Shift Type:
Click here ![]()
(b) for Floor Shift Type:
HINT:
Use the same procedure described for Column Shift Type.
3. INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
Click here ![]()
4. INSTALL LOWER INSTRUMENT PANEL
(a) for Column Shift Type:
Click here ![]()
(b) for Floor Shift Type:
HINT:
Use the same procedure described for Column Shift Type.
5. INSTALL INSTRUMENT SIDE PANEL RH
(a) for Column Shift Type:
Click here ![]()
(b) for Floor Shift Type:
HINT:
Use the same procedure described for Column Shift Type.
6. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
(a) for Column Shift Type:
Click here ![]()
(b) for Floor Shift Type:
HINT:
Use the same procedure described for Column Shift Type.
7. INSTALL COWL SIDE TRIM BOARD RH
(a) for Double Cab:
HINT:
Use the same procedure described for the LH side.
Click here
![]()
(b) for CrewMax:
HINT:
Use the same procedure described for Double Cab.
8. INSTALL FRONT DOOR SCUFF PLATE RH
(a) for Double Cab:
HINT:
Use the same procedure described for the LH side.
Click here
![]()
(b) for CrewMax:
HINT:
Use the same procedure described for the LH side.
Click here
![]()
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click here ![]()
10. PERFORM DIAGNOSTIC SYSTEM CHECK
Click here ![]()
11. CHECK SRS WARNING LIGHT
Click here ![]()