Heating, Ventilation and Air Conditioning
Multi-Pin Connector Assignment on Back of Display Control Head
In this manual: Heating, Ventilation and Air Conditioning
6steps
~36min
2/5difficulty
Done 0 of 6
Multi-Pin Connector Assignment on Back of Display Control Head, Climatic
Special tools and workshop equipment required
- Test Box Kit - 105 Pin Test Box Kit -VAG1598/42-
- Test Box Kit - Adapter 47 -VAG1598/47-
- Test Box Kit - Adapter 47-2 -1598/47-2-

5-PIN - Blower Connector
- For the connector assignment use the current wiring diagram.
16-PIN - Connector
- For the connector assignment use the current wiring diagram.
20-PIN - Connector
- For the connector assignment use the current wiring diagram.
Multi-Pin Connector Assignment on Back of Display Control Head, Electric Manual Climate Control System, through 11/05/2012
Special tools and workshop equipment required
- Test Box Kit - Basic Test Box -VAG1598/14-
- Test Box Kit - Adapter 47 -VAG1598/47-
- Cover Plate -VAG1598/47-2-

- Blower Connection - 5-PIN
- For the connector assignment use the current wiring diagram.
- 16-PIN Connector
- For the connector assignment use the current wiring diagram.
- 20-PIN Connector
- For the connector assignment use the current wiring diagram.
Multi-Pin Connector Assignment on Back of Display Control Head, Electric Manual Climate Control from 11/05/2012
Special tools and workshop equipment required
- Test Box Kit - Basic Test Box -VAG1598/14-
- Test Box Kit - Adapter 47 -VAG1598/47-
- Cover Plate -VAG1598/47-2-

- Blower Connection - 5-PIN
- For the connector assignment use the current wiring diagram.
- 16-PIN Connector
- For the connector assignment use the current wiring diagram.
- 20-PIN Connector
- For the connector assignment use the current wiring diagram.
Test yourself
A quick Volkswagen Tiguan quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?