The base surface must be free of separating agents.
Before cleaning plastic parts, temper them for 60 minutes at +60 C (140 F) to "sweat out" the separating agents.
Clean using Antistatic Plastic Cleaner -LVM 001 001 A2- or a milder Silicone Remover, Long -LVM 020 100 A5-.
Note The effort needed for cleaning depends on the type and quantity of the separating agent used. We recommend using a sanding pad to help cleaning Let the thinner evaporate (for example, air-drying overnight at room temperature or 30-40 minutes at +60 C (140F)).
Before applying the adhesive filler, lightly clean again using Antistatic Plastic Cleaner -LVM 001 001 A2- or Silicone Remover, Long -LVM 020 100 A5- (antistatic effect).
Processing
Thinner:
Do not add any thinner!
Mixture ratio:
1:1 by volume with Two-Part Adhesive Filler Hardener -LHA 005 000 A2-.
Processing time/pot life:
Adjustment for spraying 7 to 9 hours at +20 C (68 F)
Note
Do not add any thinner! The material can be sprayed after adding the hardener.
Application type "coat"
Processing viscosity 4 mm for +20 C (68 F), German Industry Standardization 53211
Processing viscosity 4 mm gravity feed spraygun "Compliant" and "HVLP":
DIN 4 mm: 16 to 18 seconds
ISO 4 mm: 37 to 45 seconds.
Set spray nozzle (see manufacturer's information): "Compliant" 1.3 to 1.4 mm.
Set spray nozzle (see manufacturer's information): "HVLP" 1.4 to 1.5 mm.
Set spray pressure (see manufacturer's information): "Compliant" to 2.0 to 2.5 bar.
Set atomizing pressure (see manufacturer's information): "HVLP" 0.7 bar.
Apply an application (apply a thin application and then a normal application after that).
The recommended dry layer thickness is between 25 and 30 mm.
Drying
Air dry at +20 C (68 F) room temperature, can be sprayed over after 15 to 20 minutes
Reworking
After a ventilation time of 15 to 20 minutes (up to a maximum of 24 hours), spray on a suitable top coat wet-in-wet at +20 C (68 F). Note If needed, the two-part plastic adhesive filler can be lightly sanded with P 800-1000 grit wet sandpaper after drying for 30 minutes (at +60 C (140 F) object temperature) or after two hours (+20 C (68 F) room temperature). Any faults in the base surface can be filled in with Two-Part Fine Filling Paste -LSP 784 002 A2- after the two-part plastic adhesive filler has dried. Filler patches must be insulated with two-part synthetic adhesion filler before applying the top coat.
Afterwards, can be painted over with:
Water-based base paint and two-part HS clear coat
Two-Part HS Top Coat
WARNING Painted plastic parts may not be cleaned with a high-pressure cleaner before 6 weeks have passed. The minimum distance between the nozzle and the object is 30 cm.
Personal Protective Equipment:
Note the safety data sheets
Wear the personal protective equipment during application
Characteristics
Delivery Viscosity
Two-Part Adhesive Filler Hardener
11 seconds
Two-Part Synthetic Adhesion Filler
100 seconds
Flashpoint:
above +23 C (73.4 F)
Storage
The guaranteed shelf life is 24 months from production date. Use no later than the date indicated on the label and store in original container at +20 C (68 F).
Storage Conditions
The prescribed storage temperature for the two-part synthetic adhesion filler is +20 C (68 F). The prescribed storage temperature for the two-part adhesive filler hardener is +20 C (68 F) (not to fall below +5 C (41 F)). If exposed to frost, the hardener should be rewarmed to +20 C (68 F). Now it is suitable for use.
?
Test yourself
A quick Volkswagen Touran quiz: every answer comes with an explanation and a link to the manual page.