Electric vehicle guide

Vehicle to load (V2L)

6steps
~36min
2/5difficulty
Done 0 of 6

The innovative Vehicle to load (V2L) system transforms your Kia EV2 into a mobile power source, allowing the high-voltage battery to supply standard AC power to a wide variety of electronic appliances and devices.

Vehicle to load V2L exterior power delivery overview for the Kia EV2

To enable the V2L functionality on your Kia EV2, simply tap the dedicated icon on the infotainment touchscreen display.

V2L electricity use settings and discharge limit configuration on the Kia EV2
  1. Electricity Use Settings (V2L)

  2. Min.%

If the vehicle reaches its pre-set power discharge limit, the supply of electricity to external devices will automatically terminate to protect the battery.

Real-time V2L status monitoring screen showing remaining time and battery percentage in the Kia EV2
  1. Min.%

  2. Time Remaining

  3. Charging status

  4. Distance to Empty

The infotainment system provides comprehensive, real-time information regarding the V2L system performance whenever external power delivery is active on your Kia EV2.