Starting system
HR16DE : Removal and Installation
In this manual: Starting system
~1min read
REMOVAL
1. Disconnect the battery cable from the negative terminal. Refer to PG-124, "Removal and Installation". 2. Remove radiator reservoir tank. Refer to CO-17, "Exploded View". 3. Disconnect harness connectors (1) from battery terminal with fusible link.4. Remove harness fixing clips (A) from F/L·fuse holder bracket.

5. Remove harness fixing clips (A) from F/L·fuse holder bracket.
6. Disconnect harness connector (1) from ECM.

7. Disengage pawl using a flat-bladed screwdriver (A). Remove F/ L·fuse holder.
: Vehicle front

8. Move F/L·fuse holder and harness to a location where they do not inhibit work.
9. Remove harness fixing clips (A) from F/L·fuse holder bracket.

10. Remove mounting bolt (A) and nut (B) of F/L·fuse holder bracket (1), and then remove F/L·fuse holder bracket.
: Vehicle front

11. Remove mounting bolt (A), and then move water hose (1) and heater thermostat (2) to a location where they do not inhibit work (CVT models).
: Vehicle front

12. Remove “B” terminal nut and “B” terminal harness. 13. Remove “S” terminal nut and “S” terminal harness. 14. Remove starter motor mounting bolts.
15. Remove starter motor towards vehicle upper.
INSTALLATION
Note the following item, and then install in the reverse order of removal.
CAUTION:Be careful to tighten “B” terminal nut to the specified torque.
Was this page helpful?