Installation
HINT:
A bolt without a torque specification is shown in the standard bolt chart (See page
).
PROCEDURE
1. INSTALL POWER MANAGEMENT CONTROL ECU
(a) Attach the 2 claws to install the power management control ECU.
2. INSTALL ECU INTEGRATION BOX RH
(a) Install the ECU integration box RH with the 2 nuts and bolt.
(b) Attach the clamp.
(c) Connect all the connectors.
NOTICE:
- Do not twist the connectors of the ECU when connecting them.
- Do not apply more force than necessary to the connectors. If more than 98 N (10 kgf, 22 lbf) of force is applied to a connector, the connector or connector holder may be damaged.
3. INSTALL NO. 2 AIR DUCT SUB-ASSEMBLY
.gif)
4. INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY
.gif)
5. INSTALL INSTRUMENT PANEL BOX DOOR COVER
.gif)
6. INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
.gif)
7. INSTALL LOWER INSTRUMENT COVER LH
.gif)
8. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
.gif)
9. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
HINT:
Use the same procedure described for the No. 1 instrument cluster finish panel garnish.
(a) Install the No. 2 instrument cluster finish panel garnish (See page
).
10. INSTALL COWL SIDE TRIM BOARD RH
(a) Attach the clip and claw to install the cowl side trim board.
(b) Install the clip.
11. INSTALL DOOR SCUFF PLATE ASSEMBLY RH
(a) Attach the 4 clips, 10 claws and 2 guides to install the door scuff plate.
12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page
).
13. CHECK SRS WARNING LIGHT
(a) Check the SRS warning light (See page
).
Test yourself
A quick Toyota 4Runner quiz: every answer comes with an explanation and a link to the manual page.