Steering

Installation

~1min read
0204060801004332N·mlb·ft
Tightening torque found on this page
INSTALLATION PROCEDURE

1. INSTALL VANE PUMP ASSEMBLY

(a) Install the vane pump with the 2 bolts.

Torque:

43 N·m {438 kgf·cm, 32 ft·lbf}

(b) Install the wire harness bracket with the bolt.

Torque:

43 N·m {438 kgf·cm, 32 ft·lbf}

2. CONNECT NO. 1 PRESSURE FEED TUBE

(a) Install a new gasket to the pressure feed tube.

(b) Connect the pressure feed tube and install the union bolt.

Torque:

50 N·m {510 kgf·cm, 37 ft·lbf}

3. CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE

(a) Connect the No. 1 oil reservoir to pump hose to the vane pump assembly with the clip.

4. CONNECT POWER STEERING OIL PRESSURE SWITCH CONNECTOR

(a) Connect the 2 connectors.

5. INSTALL FAN AND GENERATOR V BELT


6. INSTALL AIR CLEANER CASE


7. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

8. INSTALL AIR CLEANER CAP AND HOSE


9. INSTALL V-BANK COVER SUB-ASSEMBLY


10. INSTALL FRONT FENDER APRON SEAL RH


11. INSTALL FRONT WHEEL RH

Torque:

for aluminum wheel :

103 N·m {1050 kgf·cm, 76 ft·lbf}

for steel wheel :

112 N·m {1142 kgf·cm, 83 ft·lbf}

12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

13. ADD POWER STEERING FLUID

14. BLEED AIR FROM POWER STEERING FLUID

(a) Bleed air from the power steering fluid (See page ).


15. INSPECT FOR POWER STEERING FLUID LEAK

Test yourself

A quick Toyota 4Runner quiz: every answer comes with an explanation and a link to the manual page.