Meter

Installation

2steps
~12min
1/5difficulty
Done 0 of 2

1. INSTALL COMBINATION METER ASSEMBLY

INSTALL COMBINATION METER ASSEMBLY
  1. Connect the connectors.
  2. Install the combination meter assembly with the 4 screws.

2. INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY

INSTALL INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
  1. Install the instrument cluster finish panel subassembly with the 4 clips.

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

4. PERFORM INITIALIZATION

  1. Perform initialization.

NOTICE: Some systems need initialization when disconnecting the cable from the negative battery terminal.

Test yourself

A quick Toyota Sienna quiz: every answer comes with an explanation and a link to the manual page.