Engine

Installation

~1min read

1. Install purge vsv

Install purge vsv

(A) install the purge vsv with the bolt.

Torque: 10 n*m (102 kgf*cm, 7 ft.*Lbf)

(B) connect the 2 vacuum hoses and no. 1 Vacuum switching valve connector.

 Install purge vsv

2. INSTALL V-BANK COVER SUB-ASSEMBLY (See page EM-63) 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Test yourself

A quick Toyota Sienna quiz: every answer comes with an explanation and a link to the manual page.