Engine, Hybrid System
Inspection
INSPECTION
PROCEDURE
1. INSPECT PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY
(a) Using a dial indicator, measure the intermediate shaft runout.
Maximum runout:
0.61 mm (0.0240 in.)
If the intermediate shaft runout is more than the maximum, replace the propeller shaft with center bearing assembly. |
 |
(b) Using a dial indicator, measure the propeller shaft runout.
Maximum runout:
1.02 mm (0.0402 in.)
If the propeller shaft runout is more than the maximum, replace the propeller shaft with center bearing assembly. |
 |
2. INSPECT PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING
(a) Mount the propeller shaft in a vise.
NOTICE:
Be careful not to grip the propeller shaft tube too tightly in a vise as this will cause deformation. |
 |
(b) Inspect the spider bearing for wear or damage.
(c) Using a dial indicator, measure the spider bearing axial play by turning the yoke of the flange while holding the shaft tightly.
Maximum bearing axial play:
0.05 mm (0.00197 in.)
If the spider bearing axial play is more than the maximum, replace the spider bearing.
3. INSPECT NO. 1 CENTER SUPPORT BEARING ASSEMBLY
(a) Check that the bearing turns freely.
If the bearing is damaged, worn, or does not turn freely, replace it. |
 |
|
Was this page helpful?