Engine, Hybrid System

Installation

~1min read
03060901201508059N·mlb·ft
Tightening torque found on this page

INSTALLATION

PROCEDURE

1. INSTALL FRONT PROPELLER SHAFT

(a) Completely remove any oil or the like and clean the contact surfaces of the propeller shaft flange, differential flange and transfer flange.

(b) for Front Differential Side:

(1) Align the matchmarks on the differential and propeller shaft flange.

Text in Illustration

*a

for Front Differential Side

*b

Matchmark

(2) Install the propeller shaft with the 4 washers and 4 nuts.

Torque:

80 N·m {819 kgf·cm, 59 ft·lbf}

(c) for Transfer Side:

(1) Align the matchmarks on the transfer and propeller shaft flange.

Text in Illustration

*a

for Transfer Side

*b

Matchmark

(2) Connect the propeller shaft with the 4 washers and 4 nuts.

Torque:

80 N·m {819 kgf·cm, 59 ft·lbf}

2. INSTALL PROPELLER SHAFT HEAT INSULATOR BRACKET SUB-ASSEMBLY

(a) Install the heat insulator bracket to the crossmember with the 2 bolts.

Torque:

16 N·m {160 kgf·cm, 12 ft·lbf}

3. INSTALL PROPELLER SHAFT HEAT INSULATOR

(a) Install the heat insulator to the heat insulator bracket with the 2 bolts.

Torque:

16 N·m {160 kgf·cm, 12 ft·lbf}