Installation
INSTALLATION
PROCEDURE
1. INSTALL AIR CONDITIONING AMPLIFIER ASSEMBLY
(a) Install the air conditioning amplifier assembly with the 2 screws.
(b) for Manual Air Conditioning System:
Connect the 2 connectors.
(c) for Automatic Air Conditioning System:
Connect the 3 connectors.
2. INSTALL NO. 3 AIR DUCT SUB-ASSEMBLY
Click here ![]()
3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY RH
(a) for Column Shift Type:
Click here ![]()
(b) for Floor Shift Type:
HINT:
Use the same procedure described for Column Shift Type.
4. INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
Click here ![]()
5. INSTALL LOWER INSTRUMENT PANEL
(a) for Column Shift Type:
Click here ![]()
(b) for Floor Shift Type:
HINT:
Use the same procedure described for Column Shift Type.
6. INSTALL INSTRUMENT SIDE PANEL RH
(a) for Column Shift Type:
Click here ![]()
(b) for Floor Shift Type:
HINT:
Use the same procedure described for Column Shift Type.
7. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
(a) for Column Shift Type:
Click here ![]()
(b) for Floor Shift Type:
HINT:
Use the same procedure described for Column Shift Type.
8. INSTALL COWL SIDE TRIM BOARD RH
(a) for Double Cab:
HINT:
Use the same procedure described for the LH side.
Click here
![]()
(b) for CrewMax:
HINT:
Use the same procedure described for Double Cab.
9. INSTALL FRONT DOOR SCUFF PLATE RH
(a) for Double Cab:
HINT:
Use the same procedure described for the LH side.
Click here
![]()
(b) for CrewMax:
HINT:
Use the same procedure described for the LH side.
Click here
![]()
10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click here ![]()
11. PERFORM DIAGNOSTIC SYSTEM CHECK
Click here ![]()
12. CHECK SRS WARNING LIGHT
Click here ![]()