(b) Install a new brake booster gasket to the brake booster.
(c) Install the brake booster with the 4 nuts.
Torque:
15,2 N·m {155 kgf·cm, 11 ft·lbf}
3. INSTALL PUSH ROD PIN
4. INSTALL NO. 3 AIR DUCT SUB-ASSEMBLY
5. INSTALL LOWER NO. 1INSTRUMENT PANEL AIR BAG ASSEMBLY
6. CONNECT VACUUM HOSE ASSEMBLY
(a) Connect the vacuum hose onto the check valve.
NOTICE:
Do not use lubricant when installing a vacuum hose on the brake booster and check valve sides.
7. INSTALL BRAKE MASTER CYLINDER SUB-ASSEMBLY
Click here
8. CONNECT BRAKE TUBE
(a) Set each brake line to the correct position on the brake actuator as shown in the illustration.
HINT:
*1: FR RH
*2: FR LH
*3: RR RH
*4: RR LH
*5: FR Master Cylinder
*6: RR Master Cylinder
(b) Using a union nut wrench, tighten the 2 brake tubes.
Torque:
Specified tightening torque :
19,5 N·m {199 kgf·cm, 14 ft·lbf}
HINT:
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click here
When using a union nut wrench (fulcrum length of 20 mm (0.787 in.)) + torque wrench (fulcrum length of 180 mm (7.087 in.)): 17.6 N*m (179 kgf*cm, 13 ft.*lbf)
*a
Torque Wrench Fulcrum Length
*b
Union Nut Wrench
(c) Using a union nut wrench, tighten the 4 brake tubes.
Torque:
Specified tightening torque :
15,2 N·m {155 kgf·cm, 11 ft·lbf}
HINT:
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click here
When using a union nut wrench (fulcrum length of 22 mm (0.866 in.)) + torque wrench (fulcrum length of 162 mm (6.378 in.)): 13.4 N*m (137 kgf*cm, 10 ft.*lbf)
*a
Torque Wrench Fulcrum Length
*b
Union Nut Wrench
(d) Attach the clamp.
(e) Attach the 4 claws and connect the 2 No. 2 brake tube clamp.
9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable some systems need to be initialized after the cable is reconnected (See page ).