Engine, Hybrid System

Installation

~1min read
01020304050107N·mlb·ft
Tightening torque found on this page

INSTALLATION

PROCEDURE

1. INSTALL WATER INLET SUB-ASSEMBLY WITH THERMOSTAT

(a) Install a new gasket and the water inlet with thermostat with the 3 nuts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

2. CONNECT OUTLET RADIATOR HOSE

(a) Connect the radiator hose.

HINT:

The direction of hose clamp is indicated in the illustration.

3. INSTALL AIR TUBE SUB-ASSEMBLY LH

(a) Connect the air hose to the air switching valve LH, and install the air tube LH with the 2 bolts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(b) Connect the vacuum sensor connector and clamp.

(c) Connect the air tube LH to the water inlet housing with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(d) Connect the air hose.

(e) Connect the 2 wire harness clamps.

HINT:

When installing the hose, make sure the paint mark and clip are as shown in the illustration.

(f) Connect the water by-pass hose and 2 connectors.

HINT:

When installing the hose, make sure the paint mark and clip are as shown in the illustration.

4. ADD ENGINE COOLANT

5. INSPECT FOR COOLANT LEAK

6. INSTALL AIR CLEANER ASSEMBLY

7. INSTALL V-BANK COVER SUB-ASSEMBLY

8. INSTALL NO. 1 ENGINE UNDER COVER