Purge Valve
ComponentsCOMPONENTSILLUSTRATION
InspectionINSPECTIONPROCEDURE1. INSPECT PURGE VSV
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
If the result is not as specified, replace the purge VSV. (b) Inspect the purge VSV operation.
(1) Check that air does not flow from ports.
(3) Check that air flows from ports. If the result is not as specified, replace the purge VSV. InstallationINSTALLATIONPROCEDURE1. INSTALL PURGE VSV
(b) Connect the connector. 2. CONNECT PURGE LINE HOSE (a) Connect the 2 hoses. HINT: Turn the claw of the clip to the upper side. 3. INSTALL V-BANK COVER SUB-ASSEMBLY RemovalREMOVALPROCEDURE1. REMOVE V-BANK COVER SUB-ASSEMBLY 2. DISCONNECT PURGE LINE HOSE (a) Disconnect the 2 purge line hoses. 3. REMOVE PURGE VSV
(b) Remove the bolt and purge VSV. |




