Installation
1. INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP (w/o Sliding Roof)
NOTICE:
- If reusing the clips, do not remove the double-sided tape remaining on the clips and where the clips will be installed on the body.
- If installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.
(a) Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips. HINT: Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2) or more (when the temperature is 23 °C.) |
![]() |
(b) Press and install the 2 roof drip side finish moulding clips.
(c) Install the clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent). Standard Dimension
|
![]() |
(d) Install the roof drip center side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 roof drip side finish moulding clips.
HINT:
- Initial hardening time: 20 minutes
- Complete hardening time: 48 hours
2. INSTALL ROOF DRIP CENTER SIDE FINISH MOULDING (w/o Sliding Roof)
(a) Engage the 2 clips and install the roof drip center side finish moulding as shown in the illustration. |
![]() |
3. INSTALL ROOF DRIP SIDE FINISH MOULDING CLIP (w/ Sliding Roof)
NOTICE:
- If reusing the clips, do not remove the double-sided tape remaining on the clips and where the clips will be installed on the body.
- If installing new clips, remove the double-sided tape remaining where the clips will be installed on the body and clean the body with a non-residue solvent.
(a) Apply a 2 to 3 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new roof drip side finish moulding clips. HINT: Adhesive strength (tensile strength): 13.7 MPa (140 kgf/cm2) or more (when the temperature is 23 °C.) |
![]() |
(b) Press and install the 2 roof drip side finish moulding clips.
(c) Install the clips to the positions on the roof panel shown in the illustration. Determine the locations and firmly press and install the 2 roof drip side finish moulding clips after lightly applying adhesive (3M DP-105 or equivalent). Standard Dimension
|
![]() |
(d) Install the roof drip center side finish moulding when 20 minutes or more have elapsed after pressing and installing the 2 roof drip side finish moulding clips.
HINT:
- Initial hardening time: 20 minutes
- Complete hardening time: 48 hours
4. INSTALL ROOF DRIP CENTER SIDE FINISH MOULDING (w/ Sliding Roof)
(a) Engage the 2 clips and install the roof drip center side finish moulding as shown in the illustration. |
![]() |