Installation
1. INSTALL NAVIGATION RECEIVER ASSEMBLY
2. INSTALL NO. 2 RADIO RECEIVER BRACKET
(a) Install the No. 2 radio receiver bracket with the 4 screws.
Torque:
5 N·m {51 kgf·cm, 44 in·lbf}
3. INSTALL NO. 1 RADIO RECEIVER BRACKET
(a) Install the No. 1 radio receiver bracket with the 4 screws.
Torque:
5 N·m {51 kgf·cm, 44 in·lbf}
4. INSTALL STEREO COMPONENT TUNER ASSEMBLY WITH WIRE (w/ Satellite Radio)
.gif)
5. INSTALL INSTRUMENT CLUSTER CENTER FINISH PANEL SUB-ASSEMBLY
(a) Engage the 4 claws.
(b) Install the instrument cluster center finish panel sub-assembly with the 4 screws.
6. INSTALL NAVIGATION RECEIVER ASSEMBLY WITH BRACKET
(a) Connect each connector.
(b) Engage the 2 clips.
(c) Install the navigation receiver assembly with bracket with the 4 bolts.
Torque:
11 N·m {112 kgf·cm, 8 ft·lbf}
7. INSTALL NO. 2 INSTRUMENT PANEL SPEAKER PANEL SUB-ASSEMBLY
.gif)
8. INSTALL CONSOLE BOX SUB-ASSEMBLY
.gif)
9. INSTALL POSITION INDICATOR HOUSING ASSEMBLY
.gif)
10. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
.gif)
11. INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY
.gif)
12. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
.gif)
13. INSTALL COWL SIDE TRIM SUB-ASSEMBLY RH
.gif)
14. INSTALL FRONT DOOR SCUFF PLATE RH
.gif)
15. INSTALL AIR CONDITIONING CONTROL ASSEMBLY
.gif)
16. INSTALL CONSOLE BOX ASSEMBLY
.gif)
17. INSTALL NO. 2 CONSOLE BOX CARPET
.gif)
18. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (w/o Seat Heater System)
.gif)
19. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (w/ Seat Heater System)
.gif)
20. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page
).
Test yourself
A quick Toyota Venza quiz: every answer comes with an explanation and a link to the manual page.