Body and Paint

Removal and Installation - Roof Panel

48steps
~288min
5/5difficulty
010203040503022N·mlb·ft
Tightening torque found on this page
Done 0 of 48

Special Service Tools / General Equipment

Resistance Spot Welding Equipment
Knife
8 mm Drill Bit
MIG/MAG Welding Equipment
Spot Weld Drill Bit
Locking Pliers

Materials

Name Specification
Metal Bonding Adhesive
TA-1, TA-1-B, 3M™ 08115, LORD Fusor® 108B, Henkel Teroson EP 5055
-
Seam Sealer
TA-2-B, 3M™ 08308, LORD Fusor® 803DTM
-

Removal

NOTICE: Battery electric vehicles (BEV), hybrid electric vehicles (HEV) and plug-in hybrid electric vehicles (PHEV) contain a high-voltage battery. Before cutting or welding near the high-voltage battery, it must be removed to prevent damage.

NOTICE: The high-voltage battery in a battery electric vehicle (BEV), hybrid electric vehicle (HEV) or plug-in hybrid electric vehicle (PHEV) can be affected and damaged by excessively high temperatures. Temperatures in the paint booths of some body shops may exceed 60 °C. Therefore, during paint work the paint booth temperature must be set to 60 °C or lower, with a bake time of 45 minutes or less. A temperature above 60 °C or a bake longer than 45 minutes requires removing the high-voltage battery from the vehicle before placing it in the paint booth.

NOTICE: If the paint curing temperature exceeds 60 °C, the charge port indicator ring on plug-in vehicles must be removed.

  1. Refer to: Health and Safety Precautions (100-00 General Information, Description and Operation).
    Refer to: High-Voltage Systems Health and Safety Precautions — Overview (100-00 General Information, Description and Operation).
  2. Disable the SRS.
    Refer to: Supplemental Restraint System (SRS) Disabling (501-20B Supplemental Restraint System, General Procedures).
  3. Remove the liftgate.
    Refer to: Rear Door (501-03 Body Closures, Removal and Installation).
  4. Remove the liftgate opening weatherstrip.
  5. On both sides:
    Remove the side curtain airbag.
    Refer to: Side Curtain Airbag (501-20B Supplemental Restraint System, Removal and Installation).
  6. Remove the rear manifold cover.
  7. If equipped:
    Remove the roof rack.
    Refer to: Roof Rails (501-08 Exterior Trim and Ornamentation, Removal and Installation).
  8. On both sides:
    Remove the roof drip moldings.
    Refer to: Roof Molding (501-08 Exterior Trim and Ornamentation, Removal and Installation).
  9. On both sides:
    Remove the liftgate hinges.
  10. Remove the satellite antenna.
    Refer to: Satellite Radio / Global Positioning System (GPS) Antenna (415-00 Information and Entertainment System - General Information, Removal and Installation).
  11. Remove the windshield.
    Refer to: Fixed Glass (501-11 Glass, Frames and Mechanisms, General Procedures).
  12. Remove the welds.
    Use common equipment: spot weld drill bit
  13. Remove the welds.
    Use common equipment: spot weld drill bit
  14. Remove the welds.
    Use common equipment: spot weld drill bit
  15. Cut the NVH material between the roof panel and the roof bows.
    Use common equipment: knife
  16. With the help of an assistant, remove the roof panel.

Installation

NOTICE: Battery electric vehicles (BEV), hybrid electric vehicles (HEV) and plug-in hybrid electric vehicles (PHEV) contain a high-voltage battery. Before cutting or welding near the high-voltage battery, it must be removed to prevent damage.

NOTICE: The high-voltage battery in a battery electric vehicle (BEV), hybrid electric vehicle (HEV) or plug-in hybrid electric vehicle (PHEV) can be affected and damaged by excessively high temperatures. Temperatures in the paint booths of some body shops may exceed 60 °C. Therefore, during paint work the paint booth temperature must be set to 60 °C or lower, with a bake time of 45 minutes or less. A temperature above 60 °C or a bake longer than 45 minutes requires removing the high-voltage battery from the vehicle before placing it in the paint booth.

NOTICE: If the paint curing temperature exceeds 60 °C, the charge port indicator ring on plug-in vehicles must be removed.

  1. Refer to: Health and Safety Precautions (100-00 General Information, Description and Operation).
    Refer to: High-Voltage Systems Health and Safety Precautions — Overview (100-00 General Information, Description and Operation).
  2. Health and Safety Precautions.
    Refer to: Health and Safety Precautions (100-00 General Information, Description and Operation).
  3. Grind to remove the old adhesive, sealer, and clean.
  4. Weld hole drill.
    Use common equipment: 8 mm drill bit.
  5. Install locally sourced NVH repairs.
  6. With the help of an assistant, install the roof panel.
  7. Position and mark the roof panel.
  8. With the help of an assistant, remove the roof panel.
  9. Apply adhesive.
    Material: Metal adhesive / TA-1, TA-1-B, 3M™ 08115, LORD Fusor® 108B, Henkel Teroson EP 5055
  10. With the help of an assistant, install the roof panel.
  11. Position and secure the roof panel.
    Use common equipment: locking pliers
  12. Install the welds.
    Use primary equipment: resistance spot welding equipment.
  13. Install the welds.
    Use primary equipment: resistance spot welding equipment.
  14. Install the welds.
    Use common equipment: MIG/MAG welding equipment
  15. Metal finish all welds as necessary using standard metal finishing methods and materials.
  16. Seam sealing:
    All seams must be sealed to production level.
    Material: Seam Sealer / TA-2-B, 3M™ 08308, LORD Fusor® 803DTM
  17. Grind to remove the e-coat, old adhesive, and clean.
  18. Apply Ford-approved epoxy-based primer and allow to dry.
  19. Mask the area.
  20. Refinish all repairs using a Ford-approved paint system and standard painting procedures.
  21. Unmask the area.
  22. Install the windshield.
    Refer to: Fixed Glass (501-11 Glass, Frames and Mechanisms, General Procedures).
  23. Install the satellite antenna.
    Refer to: Satellite Radio / Global Positioning System (GPS) Antenna (415-00 Information and Entertainment System - General Information, Removal and Installation).
  24. Install the liftgate hinges.
    Torque: 22 lb-ft (30 N·m)
  25. On both sides:
    Install the roof drip molding.
    Refer to: Roof Molding (501-08 Exterior Trim and Ornamentation, Removal and Installation).
  26. On both sides:
    Install the side curtain airbag.
    Refer to: Side Curtain Airbag (501-20B Supplemental Restraint System, Removal and Installation).
  27. If equipped:
    Install the roof rack.
    Refer to: Roof Rails (501-08 Exterior Trim and Ornamentation, Removal and Installation).
  28. Install the liftgate.
    Refer to: Rear Door (501-03 Body Closures, Removal and Installation).
  29. Install the liftgate opening weatherstrip.
  30. Align the liftgate.
    Refer to: Rear Liftgate Alignment (501-03 Body Closures, General Procedures).
  31. Install the rear manifold cover.
  32. Reset the SRS.
    Refer to: Supplemental Restraint System (SRS) Reset (501-20B Supplemental Restraint System, General Procedures).

Test yourself

A quick Ford Escape quiz: every answer comes with an explanation and a link to the manual page.