Drivetrain

Joint Shaft Disassembly [Skyactiv G 2.0]

6steps
~36min
2/5difficulty
Done 0 of 6

1. Disassemble in the order indicated in the table.



  1. Snap ring

  2. Joint shaft component

    .

  3. Dust seal

  4. Bearing

  5. Dust cover

  6. Joint shaft


Joint Shaft Component Disassembly Note

1. After removing the snap ring, remove the dust seal and the bearing from the joint shaft component using a press.

Test yourself

A quick Mazda 3 quiz: every answer comes with an explanation and a link to the manual page.