Power Window Control System
Additional service when replacing control unit
In this manual: Power Window Control System
~1min read
Description
When the control unit replaced, the initialization in necessary for normal operation of power window system.
CAUTION:The following specified operations can not be performed under the non-initialized condition.
• Auto-up operation
• Anti-pinch function
Work Procedure
1.SYSTEM INITIALIZATIONPerform system initialization. Refer to PWC-16, "Work Procedure".
>> GO TO 2.
2.CHECK ANTI-PINCH FUNCTIONCheck anti-pinch function. Refer to PWC-17, "Work Procedure".
>> END
Was this page helpful?