Installation
HINT:
A bolt without a torque specification is shown in the standard bolt chart (See page
).
PROCEDURE
1. INSTALL REAR CONSOLE BOX ASSEMBLY
(a) Connect each connector.
(b) Attach the 2 guides.
(c) Install the rear console box assembly with the 4 bolts and 2 screws.
2. INSTALL NO. 2 CONSOLE BOX RETAINER
(a) Attach the clip, 2 claws and 2 guides to install the No. 2 console box retainer.
3. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY
(a) Connect each connector.
(b) Attach the 10 clips to install the upper console panel sub-assembly.
Text in Illustration *A |
for VF2A |
*B |
for VF2BM, VF4BM |
*C |
for 2WD |
- |
- |
4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A)
(a) Install the shift lever knob sub-assembly and turn it in the direction indicated by the arrow. |
![]() |
5. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
(a) Install the shift lever knob sub-assembly and turn it in the direction indicated by the arrow. |
![]() |
6. INSTALL FRONT NO. 1 CONSOLE BOX INSERT
(a) Attach the 2 clips and 2 guides to install the front No. 1 console box insert.
7. INSTALL FRONT NO. 2 CONSOLE BOX INSERT
(a) Attach the 2 clips and guide to install the front No. 2 console box insert.
8. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH
(a) Attach the 5 clips to install the No. 1 instrument cluster finish panel garnish.
9. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH
.gif)
Test yourself
A quick Toyota 4Runner quiz: every answer comes with an explanation and a link to the manual page.

