Audio / Visual / Telematics

Installation

~1min read
010203040502.52N·mlb·ft
Tightening torque found on this page
INSTALLATION PROCEDURE

1. INSTALL NAVIGATION ANTENNA ASSEMBLY

(a) Install the antenna with the 2 screws.

Torque:

2,5 N·m {25 kgf·cm, 22 in·lbf}

(b) Attach the clamp.

2. INSTALL DEFROSTER NOZZLE ASSEMBLY


3. INSTALL NO. 3 HEATER TO REGISTER DUCT


4. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT


5. INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT


6. INSTALL NO. 2 HEATER TO REGISTER DUCT


7. INSTALL NO. 1 HEATER TO REGISTER DUCT


8. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY

(a) Install the instrument panel sub-assembly (See page ).


9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ).

Test yourself

A quick Toyota 4Runner quiz: every answer comes with an explanation and a link to the manual page.