Vehicle Interior

Removal

~1min read
REMOVAL PROCEDURE

1. REMOVE NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH


2. REMOVE NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH


3. REMOVE HEATER CONTROL ASSEMBLY


4. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY


5. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY (for VF2A)


6. REMOVE UPPER CONSOLE PANEL SUB-ASSEMBLY


7. REMOVE NO. 2 CONSOLE BOX RETAINER


8. REMOVE LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/ Climate Control Seat System)


9. REMOVE LOWER CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY (w/o Climate Control Seat System)


10. REMOVE POWER OUTLET SOCKET ASSEMBLY

(a) Remove the power outlet socket assembly (w/ Climate Control Seat System).

(1) Using a screwdriver, detach the claw to remove the power outlet socket assembly.

Text in Illustration

*1

Protective Tape

HINT:

Tape the screwdriver tip before use.

(b) Remove the power outlet socket assembly (w/o Climate Control Seat System).

(1) Using a screwdriver, detach the claw to remove the power point socket assembly.

Text in Illustration

*1

Protective Tape

HINT:

Tape the screwdriver tip before use.

11. REMOVE POWER OUTLET SOCKET COVER

(a) Remove the power outlet socket cover (w/ Climate Control Seat System).

(1) Detach the 2 claws to remove the power outlet socket cover.

(b) Remove the power outlet socket cover (w/o Climate Control Seat System).

(1) Detach the 2 claws to remove the power outlet socket cover.

Test yourself

A quick Toyota 4Runner quiz: every answer comes with an explanation and a link to the manual page.