INSPECTION
PROCEDURE
1. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection | Condition | Specified Condition |
2 (RB) - 6 (PL) |
Shift lever in P |
Below 1 Ω |
Shift lever not in P |
10 kΩ or higher |
2 (RB) - 1 (RL) |
Shift lever in R |
Below 1 Ω |
Shift lever not in R |
10 kΩ or higher |
2 (RB) - 9 (NL) |
Shift lever in N |
Below 1 Ω |
Shift lever not in N |
10 kΩ or higher |
2 (RB) - 7 (DL) |
Shift lever in D, M, "+" or "-" |
Below 1 Ω |
Shift lever not in D, M, "+" or "-" |
10 kΩ or higher |
4 (B) - 5 (L) |
Shift lever in P or N |
Below 1 Ω |
Shift lever not in P or N |
10 kΩ or higher |
|
.png) |
*a |
Component without harness connected
(Park/Neutral Position Switch assembly) |
|
|
(b) If the result is not as specified, replace the park/neutral position switch assembly.
Was this page helpful?