Paint
Underbody Protection
In this manual: Paint
9steps
~54min
2/5difficulty
Done 0 of 9
Underbody Protection Protected Areas, Body Overview with Different Coating Densities
Note
- The underbody protection (stone impact protection) is to be repaired according to its original conditions in appearance and layer thickness.
- Water drain holes must remain free.
- All threaded pins, weld nuts with M-threads, and all other pins and contact surfaces for the assembly must be functional after applying the underbody protection.
Underbody Protection Overview

- Underbody Protection
- Layer Thickness 0.5 mm
- Underbody Protection
- Layer thickness 0.8 mm
- Underbody Protection
- Layer Thickness 1.2 mm
Underbody Protection Protected Areas
Note
- The underbody protection (stone impact protection) is to be repaired according to its original conditions in appearance and layer thickness.
- Water drain holes must remain free.
- All threaded pins, weld nuts with M-threads, and all other pins and contact surfaces for the assembly must be functional after applying the underbody protection.
Side Sill Underbody Protection
Left side shown, right side is a mirror image

- Underbody Protection
- Layer Thickness 0.5 mm
- Underbody Protection
- Layer Thickness 1.2 mm
- Dimension -x-
- 10 mm
- Runout of underbody protection with 1.2 mm to 0.5mm layer thickness
- Outer Side Sill
- Inner Side Sill
Note
- The underbody protection (stone impact protection) is to be repaired according to its original conditions in appearance and layer thickness.
- Water drain holes must remain free.
- All threaded pins, weld nuts with M-threads, and all other pins and contact surfaces for the assembly must be functional after applying the underbody protection.
Side Sill Underbody Protection on Underbody
Left side shown, right side is a mirror image

- Underbody Protection
- Layer Thickness 1.2 mm
Note
- The underbody protection (stone impact protection) is to be repaired according to its original conditions in appearance and layer thickness.
- Water drain holes must remain free.
- All threaded pins, weld nuts with M-threads, and all other pins and contact surfaces for the assembly must be functional after applying the underbody protection.
Center Underbody Protection

- Underbody Protection
- Layer Thickness 0.5 mm
Note
- The underbody protection (stone impact protection) is to be repaired according to its original conditions in appearance and layer thickness.
- Water drain holes must remain free.
- All threaded pins, weld nuts with M-threads, and all other pins and contact surfaces for the assembly must be functional after applying the underbody protection.
Rear Underbody Protection

- Underbody Protection
- Layer Thickness 0.5 mm
- Underbody Protection
- Layer thickness 0.8 mm
Test yourself
A quick Volkswagen Tiguan quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?