Engine Mechanical K9K

Precaution for Diesel Equipment

In this manual: Engine Mechanical K9K
Foreword — 1General information — 45Engine Mechanical MR16DDT — 61Engine Mechanical HR16DE — 52Engine Mechanical K9K — 46Engine Lubrication System MR16DDT — 18Engine Lubrication System HR16DE — 14Engine Lubrication System K9K — 11Engine Cooling System MR16DDT — 28Engine Cooling System HR16DE — 29Engine Cooling System K9K — 24Engine Control System MR16DDT — 163Engine Control System HR16DE — 115Engine Control System K9K — 129Fuel System MR16DDT — 13Fuel system HR16DE — 11Fuel system K9K — 12Exhaust system MR16DDT — 7Exhaust system HR16DE — 10Exhaust system K9K — 7Starting system — 24Accelerator control system — 6Clutch — 25Driveline transfer: TY21B — 77Driveline rear propeller Shaft: 3Fφ16-ETJ75 — 12Driveline rear final drive: RTVS — 31Transaxle & transmission 5MT: RS5F92R — 31Transaxle & transmission 6MT: RS6F94R — 30Transaxle & transmission CVT: RE0F10B — 93Transaxle & transmissioN CVT: RE0F11A — 103Front Axle MR16DDT — 18Front Axle HR16DE — 17Front Axle K9K — 17Rear Axle 2WD — 6Rear Axle 4WD — 13Front Suspension — 21Rear Suspension 2WD — 13Rear Suspension 4WD — 17Road Wheels & Tires — 6Brake System LHD — 24Brake System RHD — 24Parking Brake System — 8Brake Control System without ESP — 44Brake Control System with ESP — 63Steering System — 14Steering Control System — 27Seat Belt — 8SRS Airbag — 24SRS Airbag Control System — 93Ventilation System — 11Heater & Air Conditioning System HR16DE — 28Heater & Air Conditioning System MR16DDT — 28Heater & Air Conditioning Control System Type 1 — 49Heater & Air Conditioning Control System Type 2 — 51Heater & Air Conditioning Control System Type 3 — 32Heater & Air Conditioning Control System Type 4 — 40Heater & Air Conditioning Control System Type 5 — 21Interior — 16Instrument Panel — 10Seat — 18Door & Lock Type 1 — 83Door & Lock type 2 — 80Door & Lock type 3 — 65Door & Lock type 4 — 60Security Control System with intelligent key system — 82Security Control System without intelligent key system — 41Glass & Window System — 15Power Window Control System — 28Body Repair — 13Exterior — 20Mirrors — 26Exterior Lighting System Halogen type — 51Interior Lighting System — 24Wiper & Washer — 45Defogger — 31Horn — 4Power Outlet — 4Body Control System With intelligent key system — 21Body Control System Without intelligent key system — 23LAN system can fundamental — 6LAN system can — 31LAN System can system (type 1) — 1LAN System can system (type 2) — 1LAN System can system (type 3) — 1LAN System can system (type 4) — 1LAN System can system (type 5) — 1LAN System can system (type 6) — 1LAN System can system (type 7) — 2LAN System can system (type 8) — 1LAN System can system (type 9) — 1LAN System can system (type 10) — 1LAN System can system (type 11) — 1Power Control System IPDM E/R (with I-key) — 14Power Control System IPDM E/R (without I-key) — 14Power Control System Power distribution system — 25Charging System — 22Power Supply, Ground & Circuit Elements — 20Meter, Warning Lamp & Indicator — 33Warning Chime System — 22Audio, Visual & Navigation System Audio without navigation — 30Audio, Visual & Navigation System Audio with navigation — 33Audio, Visual & Navigation System NISSAN dynamic control system — 22Cruise Control System — 1Drive Mode System — 10Maintenance — 14
~9min read

CLEANLINESS

CLEANLINESS INSTRUCTIONS WHICH MUST BE FOLLOWED WHEN WORKING ON THE HIGH PRESSURE DIRECT INJECTION SYSTEM

Risks relating to contamination The system is very sensitive to contamination. The risks caused by the introduction of contamination are: • Damage or destruction of the high pressure injection system and the engine, • Seizing or leaking of a component.

All After-Sales operations must be performed under very clean conditions. This means that no impurities (particles a few microns in size) get into the system during dismantling or into the circuits via the fuel unions.

The cleanliness principle must be applied from the filter to the injectors.

WHAT ARE THE SOURCES OF CONTAMINATION?

Contamination is caused by: • Metal or plastic chips, • Paint,
• Fibres:
- Boxes,
- Brushes,
- Paper,
- Clothing,
- Cloths,
• Foreign bodies such as hair, • Ambient air,
• Etc.

IMPORTANT

: It is not possible to clean the engine using a high pressure washer because of the risk of damaging connections. In addition, moisture may collect in the connectors and create electrical connection malfunctions.

INSTRUCTIONS TO BE FOLLOWED BEFORE ANY WORK IS CARRIED OUT ON THE INJECTION SYSTEM

• Ensure that you have the plugs for the unions to be opened (bag of plugs sold at the Parts Stores - Nissan part No.: 16830 BN700, Renault part No.: 77 01 206 804). Plugs are to be used once only. After use, they must be thrown away (once used they are soiled and cleaning is not sufficient to make them reusable).

Unused plugs must be thrown away. • Ensure that you have hermetically resealable plastic bags for storing removed parts. Stored parts will therefore be less subject to the risk of impurities. The bags must be used only once, and after use they must be thrown away.

• Lint-free towelettes to be used for injection pump related service purpose. The use of a normal cloth or paper for cleaning purposes is forbidden. These are not lint-free and may contaminate the fuel circuit of the system.

Each lint-free cloth should only be used once.

INSTRUCTIONS TO BE FOLLOWED BEFORE OPENING THE FUEL CIRCUIT

• For each operation, use new thinner (used thinner contains impurities). Pour it into a clean receptacle. • For each operation, use a clean brush which is in good condition (the brush must not shed its bristles). • Use a brush and thinners to clean the connections to be opened. • Blow compressed air over the cleaned parts (tools, cleaned the same way as the parts, connections and injection system zone). Check that no bristles remain adhered. • Wash your hands before and during the operation if necessary.

• When wearing leather protective gloves, cover these with latex gloves.

INSTRUCTIONS TO BE FOLLOWED DURING THE OPERATION

• As soon as the circuit is open, all openings must be plugged to prevent impurities from entering the system.

The plugs to be used are available from the Parts Stores - Nissan part No.: 16830 BN700, Renault part No.: 77 01 206 804. They must not, under any circumstances, be reused. • Close the hermetically sealed bag, even if it has to be reopened shortly afterwards. Ambient air carries contamination. • All components of the injection system that are removed must be stored in a hermetically sealed plastic bag once the plugs have been inserted. • The use of a brush, thinner, bellows, sponge or normal cloth is strictly forbidden once the circuit has been opened. These items are likely to allow impurities to enter the system.

• A new component replacing an old one must not be removed from its packaging until it is to be fitted to the vehicle.

Instructions for Fitting the Plugs Nissan part number: 16830 BN700 (Renault part number: 77 01 206 804)

CAUTION:

CAUTION:
• The engine must not run with: - Diesel containing more than 10% diester - Petrol, even in very small amounts. • The system can inject the diesel into the engine at a pressure of up to 140,000 kPa (1,400 bar, 1,428 kg/cm2, 20,300 psi). Before carrying out any work, check that the injector rail is no longer pressurized and that the fuel temperature is not too high.

• You must respect the cleaning and safety advice specified in this document for any work on the high pressure injection system.

SPECIAL FEATURES

CAUTION:
• The engine must not operate with: - Diesel engine fuel containing more than 10% diester, - Petrol, even in tiny quantities. • The system can inject the diesel into the engine at a pressure up to 1400 bars. Before carrying out any work, check that the injector rail is not under pressure and that the fuel temperature is not too high. • You must respect the cleaning and safety advice specified in this document for any work on the high pressure injection system. • Removal of the interior of the pump and injectors is prohibited. Only the flow actuator, the fuel temperature sensor and the venturi can be replaced. • For safety reasons, it is strictly forbidden to slacken a high pressure pipe union when the engine is running. • It is not possible to remove the pressure sensor from the fuel rail because this may cause circuit contamination malfunctions. If the pressure sensor fails, the pressure sensor, the rail and the five high pressure pipes must be replaced. • It is strictly forbidden to remove any injection pump pulley marked number 070 575. If the pump is being replaced, the pulley must be replaced. • It is forbidden to repair the wiring connecting the knock sensor (accelerometer) and the CKP sensor (engine speed sensor). If the wiring should fail, it has to be replaced with new wiring. • Applying 12 volts directly to any component in the system is prohibited. • Ultrasonic carbon removal and cleaning are prohibited. • Never start the engine without the battery being connected correctly.

• It is essential to replace all the disconnected air inlet plastic pipes.

There is a 16 digit code on the injectors called individual injector correction. This code is specific to each injector, and takes into account differences in manufacture and specifies the flow injected by each of them.

When an injector is replaced, it is necessary to program the code of the new injector into the ECM.

Refer to EC-919, "Diagnosis Procedure".

INSTRUCTIONS FOR HIGH PRESSURE PIPES

TIGHTENING THE HIGH PRESSURE PIPES Rail-pump pipe
• Undo the rail,
• Grease the threads of the high pressure pipe nuts, • Insert the high pressure pipe olive into the taper of the high pressure pump outlet,
• Insert the high pressure pipe olive into the taper of the high pressure rail inlet.

• Move the nut into position by hand, on the rail side then the pump side, • Tighten the rail,
• Tighten the high pressure pipe nuts on the rail side then on the pump side.

Rail/injector pipes
• Undo the rail,
• Grease the threads of the high pressure pipe nuts, • Insert the high pressure pipe olive into the taper of the high pressure injector inlet,
• Insert the high pressure pipe olive into the taper of the high pressure rail outlet,
• Move the nuts into position by hand, on the injector side then the rail side,
• Tighten the rail,
• Ensure that the new clip, supplied with the new high pressure pipe, is fitted,
• Tighten the nuts of the high pressure pipes on the injector side first and then on the fuel rail side.

NOTE

:
Before fitting a new high pressure pipe, move back the nuts on the pipe then lightly lubricate the nut threads with the oil from the sachet provided in the parts kit.

CHECKING SEALING AFTER REPAIR

• Reprime the circuit using the priming pump. • Start the engine and allow to warm up at idle speed, visually inspecting for any fuel leaks. • Apply tracing fluid around the high pressure connections of the pipe that has been replaced. • Once the engine coolant temperature is above 50 °C and provided there are no malfunctions present, carry out a road test, taking the engine speed up to 4000 rpm at least once to check that there are no leaks. • Perform a visual inspection after the road test to make sure that there are no high pressure leaks. • Clean off the tracing fluid.

REPLACING THE INJECTORS

NOTE

:
Individual injector correction is a factory calibration carried out on each injector to adjust the flow of each one precisely, taking into account differences in manufacture.

The correction values are written on a label affixed to each injector then entered in the ECM which can then control each injector by taking account of their differences in manufacture.

The system can be programmed “WORK SUPPORT” mode with CONSULT-III.

The correction values (16 digit code) must be replaced after replacing an injector. Refer to EC-919, "Diagnosis Procedure".

• Entering each injector's individual correction value, when replacing the ECM. Refer to EC-879, "Description".