Vehicle Interior

Installation

~1min read
010203040507.56N·mlb·ft
Tightening torque found on this page
INSTALLATION PROCEDURE

1. INSTALL VOLTAGE INVERTER ASSEMBLY

(a) Install the voltage inverter with the 3 bolts.

Torque:

7,5 N·m {76 kgf·cm, 66 in·lbf}

(b) Connect the 2 connectors.

2. INSTALL DECK TRIM SIDE PANEL ASSEMBLY RH


3. INSTALL FRONT DECK SIDE TRIM COVER RH


4. INSTALL NO. 1 LUGGAGE COMPARTMENT TRIM HOOK


5. INSTALL REAR NO. 1 SEAT LAP BELT OUTER ANCHOR COVER


6. INSTALL REAR FLOOR CARPET ASSEMBLY (w/o Deck Board)


7. INSTALL REAR FLOOR MAT REAR SUPPORT PLATE


8. INSTALL NO. 1 DECK BOARD SUB-ASSEMBLY (w/o Deck Board)


9. INSTALL NO. 1 LUGGAGE COMPARTMENT TRIM COVER (w/o Deck Board)


10. INSTALL DECK BOARD ASSEMBLY (w/ Deck Board)


11. INSTALL LUGGAGE COMPARTMENT SIDE COVER SUB-ASSEMBLY RH (w/ Deck Board)


12. INSTALL LUGGAGE COMPARTMENT SIDE COVER SUB-ASSEMBLY LH (w/ Deck Board)


13. INSTALL REAR NO. 2 FLOOR BOARD ASSEMBLY (w/ Deck Board)


14. INSTALL NO. 2 DECK BOARD SUB-ASSEMBLY (w/ Deck Board)


15. INSTALL NO. 2 LUGGAGE COMPARTMENT TRIM COVER (w/ Deck Board)


16. INSTALL REAR DOOR OPENING TRIM WEATHERSTRIP RH


17. INSTALL REAR DOOR SCUFF PLATE RH


18. INSTALL QUARTER SCUFF PLATE RH (w/ Rear No. 2 Seat)


19. INSTALL REAR NO. 1 FLOOR STEP COVER (w/ Rear No. 2 Seat)

Test yourself

A quick Toyota 4Runner quiz: every answer comes with an explanation and a link to the manual page.