Drivetrain

Reassembly

~1min read
01020304050107N·mlb·ft
Tightening torque found on this page
REASSEMBLY PROCEDURE

1. INSTALL SHIFT SOLENOID VALVE S2

(a) Coat a new O-ring with ATF and install it to the solenoid valve.

Text in Illustration

*1

New O-Ring

(b) Install the solenoid valve with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

2. INSTALL SHIFT SOLENOID VALVE S1


(a) Install the solenoid valve with the bolt.

Torque:

6,4 N·m {65 kgf·cm, 57 in·lbf}

3. INSTALL SHIFT SOLENOID VALVE SL1


4. INSTALL SHIFT SOLENOID VALVE SLT

(a) Install the solenoid valve.

(b) Install the 2 straight pins and solenoid lock plate with the bolt.

Torque:

6,4 N·m {65 kgf·cm, 57 in·lbf}

5. INSTALL SHIFT SOLENOID VALVE SL2


6. INSTALL SHIFT SOLENOID VALVE SLU

(a) Install the solenoid valve.

(b) Install 2 straight pins and solenoid lock plate with the bolt.

Torque:

6,4 N·m {65 kgf·cm, 57 in·lbf}

7. INSTALL SHIFT SOLENOID VALVE SR

(a) Install the solenoid valve with the 2 bolts.

Torque:

6,4 N·m {65 kgf·cm, 57 in·lbf}

Test yourself

A quick Toyota 4Runner quiz: every answer comes with an explanation and a link to the manual page.