INSTALLATION

PROCEDURE

1. INSTALL NO. 1 INTEGRATION RELAY

(a) Connect the 2 connectors.

(b) Engage the claws to install the No. 1 integration relay, as shown in the illustration.

Install in this direction

2. INSTALL NO. 1 RELAY BLOCK COVER

(a) Engage the claws to install the No. 1 relay block cover, as shown in the illustration.

Install in this direction

3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When the cable has been disconnected, some systems must be reset after the cable is reconnected.