1. INSPECT LEVEL WARNING SWITCH ASSY
HINT:
This inspection must be performed with the level warning switch assy installed on the washer reservoir.
(a) Fill the washer reservoir with washer fluid. |
|
(b) Measure the resistance according to the value(s) in the table below.
Standard resistance:
Tester Connection | Condition | Specified Condition |
|---|---|---|
1 (S) - 2 (E) |
The fluid volume is 600 to 800 cm3 (36.6 to 48.8 cu in) minimum* |
10 kΩ minimum |
The fluid volume is 600 to 800 cm3 (36.6 to 48.8 cu in) maximum* |
Below 1 Ω |
HINT:
*: The level warning switch assy starts to operate when the fluid volume is 600 to 800 cm3 (36.6 to 48.8 cu in), depending on vehicle conditions.
If the result is not as specified, replace the level warning switch assy.