Inspection
INSPECTION
PROCEDURE
1. INSPECT READING LIGHT ASSEMBLY
(a) Inspect the reading light. (1) Apply battery voltage to the reading light assembly and check that the reading light illuminates. OK:
If the result is not as specified, replace the bulb or reading light assembly. |
|
(b) Inspect the door switch.
(1) Measure the resistance according to the value(s) shown in the table below.
Standard resistance:
Tester Connection | Ignition switch position | Specified Condition |
|---|---|---|
10 (DOOR) - 4 (RLMP) |
Door switch in ON position |
Below 1 Ω |
Door switch in OFF position |
10 kΩ minimum |
If the result is not as specified, replace the reading light assembly.
(c) Inspect the light switch.
(1) Apply battery voltage to the reading light assembly and check that the light illuminates.
OK:
Battery connection | Specified Condition |
|---|---|
Battery positive (+) → 2 (ILLB) Battery negative (-) → 3 (GND) |
Light operates |
If the result is not as specified, replace the reading light assembly.