Inspection
INSPECTION
PROCEDURE
1. INSPECT REAR STABILIZER LINK ASSEMBLY
(a) Inspect the ball joint swivel torque.
(1) Clamp the rear stabilizer link assembly in a vise between aluminum plates.
NOTICE:
Do not overtighten the vise.
(2) Install the nut onto the stud of the rear stabilizer link assembly.
(3) Move the stud back and forth several times. Using a torque wrench, turn the stud continuously at a rate of one revolution every 3 to 5 seconds, and read the torque value on the 5th turn.
Standard turning torque:
0.05 to 1.96 N*m (0.6 to 19 kgf*cm, 0.5 to 17 lbf*in)
HINT:
If the swivel torque is not within the specified range, replace the rear stabilizer link assembly with a new one.
(4) Turn the stud to make sure that the stud does not bind and that there is no play.
HINT:
If the stud binds or there is play when turned, replace the rear stabilizer link assembly with a new one.
(b) Inspect the dust boot.
(1) Check that the dust boot is not cracked and has no grease on it.
HINT:
If the dust boot is cracked or there is MP grease inside, replace the rear stabilizer link assembly with a new one.