Inspection
INSPECTIONPROCEDURE1. INSPECT SHIFT SOLENOID VALVE SL1
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
(b) Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise. OK:
If the result is not as specified, replace the solenoid valve. 2. INSPECT SHIFT SOLENOID VALVE S1
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
(b) Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise. OK:
If the result is not as specified, replace the solenoid valve. 3. INSPECT SHIFT SOLENOID VALVE S2
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
(b) Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise. OK:
If the result is not as specified, replace the solenoid valve. 4. INSPECT SHIFT SOLENOID VALVE S3
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
(b) Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise. OK:
If the result is not as specified, replace the solenoid valve. 5. INSPECT SHIFT SOLENOID VALVE S4
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
(b) Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise. OK:
If the result is not as specified, replace the solenoid valve. 6. INSPECT SHIFT SOLENOID VALVE SL2
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
(b) Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise. OK:
If the result is not as specified, replace the solenoid valve. 7. INSPECT SHIFT SOLENOID VALVE SR
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
(b) Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise. OK:
If the result is not as specified, replace the solenoid valve. 8. INSPECT SHIFT SOLENOID VALVE SLT
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
(b) Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise. OK:
If the result is not as specified, replace the solenoid valve. 9. INSPECT SHIFT SOLENOID VALVE SLU
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance:
(b) Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise. OK:
If the result is not as specified, replace the solenoid valve. |