Engine, Hybrid System

Inspection

~1min read

INSPECTION

PROCEDURE

1. INSPECT AIR SWITCHING VALVE ASSEMBLY

(a) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

Tester Connection

Condition

Specified Condition

1 - 5

20 °C

4.5 to 5.5 Ω

1 - Body ground

Always

1 MΩ or higher

5 - Body ground

Text in Illustration

*a

Component without harness connected

(Air Switching Valve Assembly)

NOTICE:

When measuring the resistance, do not touch terminals 2, 3 or 4.

HINT:

When measuring the resistance, make sure that the surface temperature of the air switching valve assembly is 20 °C.

If the result is not as specified, replace the air switching valve assembly.

(b) Check the operation of the air switching valve assembly.

(1) Check that air does not flow from port A to port B.

Text in Illustration

*a

Port A

*b

Port B

Air

NOTICE:

Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less.

If the result is not as specified, replace the air switching valve assembly.

(2) Apply battery voltage across terminals 1 and 5.

Text in Illustration

*a

Component without harness connected

(Air Switching Valve Assembly)

*b

Port A

*c

Port B

Air

NOTICE:

When applying voltage, do not touch terminals 2, 3 or 4.

(3) Check that air flows from port A to port B.

If the result is not as specified, replace the air switching valve assembly.