Installation
INSTALLATION
PROCEDURE
1. INSTALL FENDER ANTENNA ASSEMBLY
(a) Install the fender antenna assembly with the bolt.
Torque:
9 N·m {92 kgf·cm, 80 in·lbf}
(b) Attach the 5 clamps and install the bolt.
Torque:
9 N·m {92 kgf·cm, 80 in·lbf}
(c) Connect each connector.
2. INSTALL FRONT FENDER LINER RH

3. INSTALL SIDE STEP ASSEMBLY RH (w/ Side Step)

4. INSTALL FRONT FENDER MUDGUARD RH (w/ Front Fender Mudguard)

5. INSTALL ANTENNA ORNAMENT
(a) Install the antenna ornament as shown in the illustration.
6. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
(a) for Column Shift Type:
(See page
)
(b) for Floor Shift Type:
(See page
)
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page
).
8. CHECK SRS WARNING LIGHT
(See page
)
9. INSTALL PULL TOP ANTENNA POLE SUB-ASSEMBLY
(See page
)