Audio, Visual, Telematics

Installation

~1min read
010203040503.53N·mlb·ft
Tightening torque found on this page

INSTALLATION

PROCEDURE

1. INSTALL STEREO COMPONENT TUNER ASSEMBLY

(a) Attach the 2 guides to install the stereo component tuner assembly as shown in the illustration.

2. INSTALL NO. 2 RADIO RECEIVER BRACKET

(a) Install the No. 2 radio receiver bracket with the 5 bolts.

Torque:

3,5 N·m {36 kgf·cm, 31 in·lbf}

3. INSTALL NO. 1 RADIO RECEIVER BRACKET

(a) Install the No. 1 radio receiver bracket with the 5 bolts.

Torque:

3,5 N·m {36 kgf·cm, 31 in·lbf}

4. INSTALL NO. 1 NAVIGATION WIRE

(a) Connect each connector to install the No. 1 navigation wire.

5. INSTALL RADIO AND DISPLAY RECEIVER ASSEMBLY

6. INSTALL AIR CONDITIONING CONTROL ASSEMBLY

7. INSTALL CENTER LOWER INSTRUMENT COVER

8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ).