Engine, Hybrid System
Installation
Tightening torque found on this page
INSTALLATION
PROCEDURE
1. INSTALL EGR VALVE BRACKET
(a) Install the EGR valve bracket with the 3 bolts.
Torque:
21 N·m {214 kgf·cm, 15 ft·lbf} |
 |
2. INSTALL NO. 3 EGR PIPE SUB-ASSEMBLY
(a) Install a new gasket and the No. 3 EGR pipe with the 2 nuts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf} |
 |
3. INSTALL EGR INLET
(a) Install a new gasket and the EGR inlet with the 2 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
NOTICE:
Make sure the gasket's claws are not caught between the EGR inlet and EGR valve. |
 |
4. INSTALL EGR VALVE ASSEMBLY
(a) Install a new gasket to the intake manifold. |
 |
(b) Install a new gasket to the No. 2 EGR pipe. |
 |
(c) Temporarily install the EGR valve assembly to the intake manifold with the 2 bolts and 4 nuts.
NOTICE:
Be careful not to damage the intake manifold when installing the EGR valve assembly. |
 |
(d) Using several steps, uniformly tighten the 2 bolts and 4 nuts in the sequence shown in the illustration.
Torque:
for bolt :
21 N·m {214 kgf·cm, 15 ft·lbf}
for nut :
10 N·m {102 kgf·cm, 7 ft·lbf} |
 |
5. CONNECT NO. 13 WATER BY-PASS HOSE
(a) Connect the No. 13 water by-pass hose.
HINT:
The direction of the hose clamp is indicated in the illustration. |
 |
6. CONNECT NO. 12 WATER BY-PASS HOSE
(a) Connect the No. 12 water by-pass hose.
HINT:
The direction of the hose clamp is indicated in the illustration. |
 |
7. INSTALL AIR CLEANER HOSE ASSEMBLY
8. ADD ENGINE COOLANT
9. INSPECT FOR ENGINE COOLANT LEAK
10. INSTALL V-BANK COVER SUB-ASSEMBLY
 |
Was this page helpful?