Engine, Hybrid System
Removal
REMOVAL
PROCEDURE
1. REMOVE V-BANK COVER SUB-ASSEMBLY
2. REMOVE AIR CLEANER HOSE ASSEMBLY
3. DRAIN ENGINE COOLANT
4. DISCONNECT NO. 12 WATER BY-PASS HOSE
(a) Disconnect the No. 12 water by-pass hose. |
 |
5. DISCONNECT NO. 13 WATER BY-PASS HOSE
(a) Disconnect the No. 13 water by-pass hose. |
 |
6. REMOVE EGR VALVE ASSEMBLY
(a) Disconnect the 3 clamps and connector. |
 |
(b) Remove the 4 nuts. |
 |
(c) Remove the 2 bolts and EGR valve. |
 |
(d) Remove the gasket from the No. 2 EGR pipe.
NOTICE:
Be careful not to damage the installation surface of the gaskets. |
 |
(e) Remove the gasket from the intake manifold. |
 |
7. REMOVE EGR INLET
(a) Remove the 2 bolts, EGR inlet and gasket.
NOTICE:
Be careful not to damage the installation surface of the gaskets. |
 |
8. REMOVE NO. 3 EGR PIPE SUB-ASSEMBLY
(a) Remove the 2 nuts, No. 3 EGR pipe and gasket.
NOTICE:
Be careful not to damage the installation surface of the gaskets. |
 |
9. REMOVE EGR VALVE BRACKET
(a) Remove the 3 bolts and EGR valve bracket. |
 |
|
Was this page helpful?