1ar-fe Cooling

Installation

~1min read
01020304050107N·mlb·ft
Tightening torque found on this page
INSTALLATION PROCEDURE

1. INSTALL THERMOSTAT

(a) Install a new gasket to the thermostat.

(b) Install the thermostat with the jiggle valve facing upward.

HINT:

The jiggle valve may be set to within 10° on either side of the prescribed position.

2. INSTALL WATER INLET

(a) Install the water inlet with the 2 nuts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

3. CONNECT NO. 2 RADIATOR HOSE


4. INSTALL GENERATOR ASSEMBLY


5. INSTALL WIRE HARNESS CLAMP BRACKET


6. INSTALL V-RIBBED BELT

HINT:

See page


7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page ).


8. ADD ENGINE COOLANT


9. INSPECT FOR COOLANT LEAK


10. INSTALL COOL AIR INTAKE DUCT SEAL


11. INSTALL NO. 1 ENGINE UNDER COVER

12. INSTALL NO. 2 ENGINE UNDER COVER

13. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

Test yourself

A quick Toyota Venza quiz: every answer comes with an explanation and a link to the manual page.