Installation
1. INSTALL THERMOSTAT
(a) Install a new gasket to the thermostat.
(b) Install the thermostat with the jiggle valve facing upward. HINT: The jiggle valve may be set to within 10° on either side of the prescribed position. |
![]() |
2. INSTALL WATER INLET
(a) Install the water inlet with the 2 nuts. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} |
![]() |
3. CONNECT NO. 2 RADIATOR HOSE
.gif)
4. INSTALL GENERATOR ASSEMBLY
.gif)
5. INSTALL WIRE HARNESS CLAMP BRACKET
.gif)
6. INSTALL V-RIBBED BELT
HINT:
See page .gif)
7. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page
).
8. ADD ENGINE COOLANT
.gif)
9. INSPECT FOR COOLANT LEAK
.gif)
10. INSTALL COOL AIR INTAKE DUCT SEAL
.gif)
11. INSTALL NO. 1 ENGINE UNDER COVER
12. INSTALL NO. 2 ENGINE UNDER COVER
13. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
.gif)
Test yourself
A quick Toyota Venza quiz: every answer comes with an explanation and a link to the manual page.

.png)