2gr-fe Battery / Charging
Replacement
In this manual: 2gr-fe Battery / Charging
~1min read
5special tools
REPLACEMENT PROCEDURE
1. REPLACE GENERATOR DRIVE END FRAME BEARING
(a) Remove the 4 screws and bearing retainer from the drive end frame. |
![]() |
(b) Using SST and a hammer, tap out the drive end frame bearing from the drive end frame. SST: 09950-60010 09951-00250 SST: 09950-70010 09951-07100 |
![]() |
(c) Using SST and a press, press in a new generator drive end frame bearing. SST: 09950-60010 09951-00470 SST: 09950-70010 09951-07100 |
![]() |
(d) Fit the tabs on the retainer plate into the cutouts on the drive end frame to install the retainer plate. Text in Illustration
|
![]() |
(e) Install the 4 screws.
Torque:
2,3 N·m {23 kgf·cm, 20 in·lbf}
Test yourself
A quick Toyota Venza quiz: every answer comes with an explanation and a link to the manual page.
Was this page helpful?



