7- speed dual clutch gearbox 0CW

Assembly overview - clutch engagement

~1min read
0102030405086N·mlb·ft
Tightening torque found on this page
Assembly overview - clutch engagement
1 - Shim for “K 1”

Determining thickness → Chapter.

2 - Large engaging lever for “K 1”

With engagement bearing

Removing and installing → Chapter

3 - Hinge mounting

For large engaging lever “K 1”

Cannot be renewed.

4 - Small engagement bearings for “K 2”
5 - Shim for “K 2”

Determining thickness → Chapter.

6 - Upper section of bushing

For small engaging lever “K 2”

Is removed and installed together with small engaging lever and lower section of bushing
7 - Small engaging lever for “K 2”

Is removed and installed together with upper and lower section of bushing

Removing and installing → Chapter

8 - Ball pin

For small engaging lever “K 2”

Removing and installing → Anchor

9 - Bolt

Always renew after removing.

8 N·m +90°

10 - Lower section of bushing

For small engaging lever “K 2”

Is removed and installed together with small engaging lever and upper section of bushing

Test yourself

A quick Volkswagen Golf quiz: every answer comes with an explanation and a link to the manual page.