Running gear, axles, steering

Assembly overview - drive shaft, constant velocity joint VL107

~1min read
060120180240300200148N·mlb·ft
Tightening torque found on this page
Assembly overview - drive shaft, constant velocity joint VL107
1 - Bolt

Renew after removing

Loosening and tightening → Chapter

Before fitting, clean the threads in the CV joint using a thread tap.

200 N·m +180°

2 - Outer constant velocity joint

Renew only as complete unit

Removing → Anchor.

Installing: drive onto shaft to stop using plastic hammer

Checking → Chapter

3 - Retaining ring

Renew after removing

Insert in groove in shaft

4 - Clamp

Renew after removing

Tightening → Fig.

5 - Boot

Check for splits and chafing

Material: Hytrel (polyester elastomer)

6 - Clamp

Renew after removing

Tightening → Fig.

7 - Drive shaft
8 - Clamp

Renew after removing

Tightening → Fig.

9 - Boot for constant velocity joint

Material: Hytrel (polyester elastomer)

Without breather hole

Check for splits and chafing

Drive off constant velocity joint with a drift

Coat sealing surface of constant velocity joint with -D 454 300 A2- before installing.
10 - Clamp

Renew after removing

Tightening → Fig.

11 - Locking plate
12 - Cap

Drive off carefully with drift

Coat sealing surface of constant velocity joint with -D 454 300 A2- before installing.

Adhesive surface must be free of oil and grease!

13 - Inner constant velocity joint

Renew only as complete unit

Pressing off → Fig.

Pressing on → Fig.

Checking → Chapter

14 - Retaining ring

Remove and install with circlip pliers -VW 161 A-.

15 - Cover

Renew after removing

Always renew

Pressing off → Fig.

16 - Multi-point socket head bolt

Renew after removing

M10 x 52

Initially tighten diagonally to 10 N·m and then tighten diagonally to specified torque.

70 N·m

Test yourself

A quick Volkswagen Golf quiz: every answer comes with an explanation and a link to the manual page.